The membrane is installed in a shingle-like pattern in the prevailing wind direction. The horizontal overlaps must be at least 100 mm for roof slopes greater than 25°, at least 150 mm for slopes between 15° and 25°, and at least 200 mm for slopes between 10° and 15°. For roof slopes below 25°, VASTR® Nail Sealing Tape must be applied, and the overlap must be bonded using the integrated adhesive strip or VASTR® non-woven tape. For vertical overlaps, a width of at least 150 mm and at most 200 mm applies, with the seam always positioned under a batten.
The membrane is fastened to the structure with stainless steel staples, after which counter battens are placed over the staples. When used with façade cladding, a pressure strip is placed over the staples on the stud.
At a corner, the membrane is folded over to the next available stud and secured with staples and, if necessary, a pressure strip.